← Return to Gratitude Discussion Group

Discussion

Gratitude Discussion Group

Just Want to Talk | Last Active: Apr 4, 2023 | Replies (3672)

Comment receiving replies
@gingerw

@rosemarya The first link was the one we worked on last weekend, and showed the road test that is required for all floats. The second link the 2018 float; I glued black pepper seed, anise seed, and split lentils on butterfly wings for that one.
Thanks for the links. This year the floats will be completed "in place" rather then putting them together 90% of the way and moving them to a finish barn near the parade route. Everything will be moved just once this year from the design barn to the parade route. They will be moved into place about 10 a.m. on the morning of the 31December. It takes about 10 hours to move them since they only go two and a half miles an hour at top speed!

Jump to this post


Replies to "@rosemarya The first link was the one we worked on last weekend, and showed the road..."

@gingerw so glad for this information Its looks beautiful If I was there in Pasadena I would be there I enjoyed working on the Cal,Poly float fun Ill be looking for it are you riding on it?

Ginger, that is amazing. I am reading this from afar, and proud to be able to tell my friends that I know someone who is working on th Gift of Life float!